Photo: Contributers2020, Wikimedia Commons, CC BY-SA 4.0. Green crop fields and a dirt road in the village of Targaon, Maharashtra, with a hill and power lines in the hazy distance. This is an illustrative photo of rural farmland in Maharashtra and not of any plot, village or survey mentioned in this guide.
Quick answer: Use BhuNaksha for an initial view of the recorded plot and its neighbouring survey numbers. If you need the recorded boundary identified on the ground, apply for a measurement in e-Mojni Version 2 through the Mahabhumi portal or the direct e-Mojni 2.0 login, pay the fee, and keep two numbers: the CAN you get when you file and the MRN you get once the land records office accepts the file. The Land Records Department FAQ gives approximate timelines of 90 days for regular measurement and 30 days for fast measurement, subject to office workload and surveyor availability.
This is a researched guide, not an official notice or legal advice. NaviMumbai.com is not affiliated with the Maharashtra Land Records Department.
When the map is enough and when you need a measurement
Our guide to the Maha BhuNaksha village map shows how to find a plot on the BhuNaksha viewer.
Use BhuNaksha for an initial view of the recorded parcel shape and adjoining survey numbers. Use an official measurement when you need the recorded boundary identified on the ground. Neighbouring survey numbers do not necessarily show the names of the current adjoining owners. The FAQ lists these reasons for measurement: fixing a boundary, a boundary dispute, new construction, splitting a plot and checking land papers.
| Your situation | Where to start |
|---|---|
| Find the plot, neighbours and shape | BhuNaksha map and your 7/12 extract |
| Boundary stones missing or neighbour disagrees | e-Mojni application for a boundary measurement (hadd kayam) |
| Co-owners want separate 7/12 and map for each share | Sub-division measurement (pot hissa) is the type the FAQ names. Inside municipal or planning-authority limits, a provisionally approved layout is needed first |
| Court has appointed a commission over a boundary | Court commission measurement, ordered by the civil court |
For land within municipal or planning-authority limits, check the required layout approval before applying for subdivision measurement. The FAQ says a provisionally approved layout from the relevant office is needed. Measurement alone does not authorise a proposed subdivision. Separate records come from the department’s applicable process, and are not created automatically by submitting the measurement application.
Before you apply
Keep these ready before you open the application:
- District, taluka and village.
- The survey or gat number, or the city survey number.
- The relevant land record, such as your 7/12 extract or property card.
- Your identity proof as the applicant.
- Name, address and mobile number of at least three co-holders of the same gat, survey or city survey number, where there are co-holders.
- Name, address and mobile number of adjoining holders. The FAQ asks for at least one holder for the three directions around the plot. If a neighbour’s name does not appear from the 7/12, the FAQ says to use the extra information option and add it yourself.
- Authority to act, such as a power of attorney that lets the holder apply and act until the measurement is done, if you cannot be present.
- The signed copy of your application, ready to upload.
The FAQ says the online application does not need to be printed and submitted at the office afterwards.
The application steps
- Open the Mahabhumi portal, go to Premium Services and click e-Mojni Version-2. You can also go straight to the e-Mojni 2.0 login.
- Choose your division where it says to select your division.
- Register as a new user and follow the portal’s current username and password requirements.
- Fill in the measurement application and choose the type, such as boundary measurement. The FAQ names regular and fast timelines.
- At the document upload step, download the application you filled, sign it and upload it.
- Pay the fee. The fee depends on whether the land is inside or outside a municipal area, the applicant type, the area and the timeline. You can see it on the application screen.
- Pay through the payment button and prefer the payment instructions generated for your application. For offline payment, download the challan and complete it in the state GRAS system under Pay Without Registration, choosing the Settlement Commissioner and Director of Land Records and then your office. The FAQ says online payment in GRAS is also available. The FAQ also lists different payment heads for different measurement types (for example boundary and court commission measurement against subdivision and non-agricultural measurement), so if you use a separate GRAS challan, confirm the office, measurement category and applicable account head before paying. Keep the receipt and check that the payment is reflected against your application.
If you get stuck, read the pop-up notes on the application page, then contact your office or the helpline on the e-Mojni 2.0 home page, as the FAQ advises.
CAN and MRN: what each number means
| CAN | MRN | |
|---|---|---|
| Full form | Citizen Application Number | Mojni Register Number |
| When you get it | When you submit a complete application with the measurement fee | After the office checks the application and accepts it |
| What it tells you | The application has been filed in the system | The office has accepted the case and given it a unique reference |
If the office sends the file back with a defect in the fee or the information, log in with the same login, select your CAN, correct the details and submit again, according to the Land Records Department FAQ.
Save the application PDF, the CAN, the payment receipt and, once issued, the MRN. Use the reference that the relevant status screen asks for. Getting a CAN does not mean the office has approved the survey: it only shows the application was filed.
After the office accepts your application
- Waiting list: the FAQ describes a taluka waiting list inside e-Mojni 2.0. From the login page, the “mojni case information” option lets you pick the district, taluka and village. The older public e-Mojni citizen site also has a legacy waiting list by district. It is a resource from the earlier system, so do not assume it tracks a new Version 2.0 application.
- Notice to neighbours: the FAQ describes measurement as a process where all interested parties are given notice and a field surveyor (bhukarmapak) then measures the plot and marks the boundary against government records.
- On measurement day: plan to be there, or to have an authorised representative if the office allows it. If you cannot attend, contact the responsible office in advance. The FAQ says that if the surveyor attends and the applicant is absent, a panchnama is recorded and the application is closed as a revisit, and a revisit fee is paid for a fresh date. The FAQ gives that fee as half the original measurement fee or ₹10,000, whichever is lower, so follow the office’s instructions on the date and the fee.
- The map copy: once the work is done, the measurement map, called the “ka prat”, is available online. You can download it with a digital signature from your login.
A Panvel or Uran village example
Illustrative example, not a reported case. Say a family owns a plot in a village in Panvel or Uran taluka, both in Raigad district. They want a compound wall, but the old boundary stones are gone. BhuNaksha shows the gat number, the plot shape and the neighbouring gat numbers, but it does not put a stone on the ground.
Before they pick the application details, they confirm whether the property is identified by a survey or gat number, a city survey number or another authority’s plot reference. Then the family applies for a boundary measurement, uploads the signed application and pays the fee, which gives them a CAN. After the office accepts the file they get an MRN. They check the waiting list in their login, attend on the date and later download the signed ka prat from their login. If the land falls in the NAINA area, our NAINA land buying checks explain the extra checks to do. The ka prat shows the recorded boundary. It is not the approval to build the wall, so any permission the local authority requires is a separate step.
What a measurement does not settle
A measurement fixes the boundary according to government records. It does not prove who owns the land. The FAQ says an objection can be filed with the taluka Deputy Superintendent of Land Records or City Survey Officer. It also says a higher check measurement is possible when the applicant or an adjoining holder objects within the prescribed time. If a case is already in court, or neighbours are contesting the result, talk to a lawyer before acting on the map.
Frequently Asked Questions
What is the difference between CAN and MRN?
CAN is the Citizen Application Number you receive when a complete application is filed with the fee. MRN is the Mojni Register Number the system gives after the office checks and accepts the application.
How much does measurement cost?
The fee depends on whether the land is inside or outside a municipal area, the applicant type, the area and the timeline. The amount is shown on the application screen and on the department’s fee page.
How long does a measurement take?
The FAQ gives approximate timelines of 90 days for regular measurement and 30 days for fast measurement, subject to office workload and surveyor availability.
What if I cannot attend the measurement?
If you cannot attend, contact the responsible office in advance about authorised representation. If measurement cannot be completed and the case is recorded for a revisit, follow the office’s instructions for the fresh date and the applicable fee.
How this guide was checked
- Steps, number meanings, document needs and timelines are taken from the Land Records Department FAQ, read on 23 November 2026.
- The older public e-Mojni citizen page was opened on 23 November 2026. It belongs to the earlier system, so its fee and waiting list pages may not apply to a new Version 2.0 application.
- No fee amounts are quoted. Check the amount on the application screen.
Sources
| Source | What it covers |
|---|---|
| Land Records Department FAQ | Application steps, CAN and MRN, documents, timelines, ka prat |
| Mahabhumi portal | Premium and free services, entry to e-Mojni |
| Older e-Mojni citizen page | Legacy fee and waiting list pages, retained for reference |
| Maha BhuNaksha | Village and plot map viewer |
Checked 23 November 2026. Portal screens and fees change, so confirm the details with your taluka land records office before you apply.
NaviMumbai.com is an independent information site and is not affiliated with any government body.
