Table of Content
ToggleUpdated & verified: 26 August 2026. Fares, timings, and ticketing details on this page are checked against CIDCO announcements and dated local press coverage. Metro schedules and digital ticketing features can change. If something here looks off during your trip, check the notice boards at your station before you travel.
The Navi Mumbai Metro’s Line 1 runs 11.10 km between CBD Belapur and Pendhar, with 11 stations, operated by CIDCO. This guide covers what commuters actually need: current fares, how to buy a ticket, the full station list, and first/last train times, not real estate speculation.
Quick Answer
| Route | CBD Belapur ↔ Pendhar, 11.10 km, 11 stations, fully elevated |
| Fare range | ₹10 to ₹30 depending on distance |
| Monthly pass | No current pass product found in official information reviewed |
| How to buy a ticket | QR-code ticket at the station counter (confirmed operational) |
| WhatsApp / app / NCMC ticketing | Announced as “coming soon” by CIDCO; not yet live as of the latest dated reporting found |
| First train | 6:00 AM from both CBD Belapur and Pendhar |
| Last train | 10:00 PM from CBD Belapur, 9:45 PM from Pendhar |
| Frequency | Every 10 minutes at peak, every 15 minutes off-peak |
| Airport connection | Not operational. Line 1A, Line 2 and the separate Metro Line 8 are approved (June 2026 and Feb 2026) but not yet under construction |
Route Map: CBD Belapur to Pendhar

This is a simplified schematic for orientation, not a geographically precise map. Line 1 runs entirely elevated, connecting CBD Belapur in the northwest to Pendhar in the southeast, a 11.10 km run currently scheduled to take about 25 minutes 30 seconds one-way, following a July 2026 timetable adjustment by CIDCO.1
Line 1: The Complete Overview
Navi Mumbai Metro Line 1 is CIDCO’s first operational metro corridor, connecting CBD Belapur to Pendhar across 11 stations. The line commenced commercial operations in November 2023 and has since gone through two significant operational updates that matter for commuters: a fare cut in September 2024, and a timetable revision in January 2025 that introduced the current peak/off-peak frequency structure. Both are reflected in the figures on this page.
All 11 Stations on Line 1
- CBD Belapur (adjacent to CBD Belapur suburban railway station)
- RBI Colony
- Belpada
- Utsav Chowk
- Kendriya Vihar
- Kharghar Village
- Central Park
- Pethpada
- Amandoot
- Pethali-Taloja
- Pendhar
CBD Belapur station is built next to the CBD Belapur suburban rail station, giving a practical interchange with Mumbai’s suburban network at that end of the line. A direct rail interchange at Pethali-Taloja has not been independently confirmed; treat it as a station on the metro line only unless confirmed locally.
Navi Mumbai Metro Fare 2026
CIDCO cut Line 1 fares by roughly a third in September 2024. The current distance-based fare table, confirmed across multiple dated press reports:2
| Distance travelled | Fare |
|---|---|
| 0-2 km | ₹10 |
| 2-4 km | ₹10 |
| 4-6 km | ₹20 |
| 6-8 km | ₹20 |
| 8-10 km and beyond | ₹30 |
The full CBD Belapur-Pendhar journey now costs ₹30, down from ₹40 before the September 2024 revision. This fare chart is not published directly on CIDCO’s own site; it reflects CIDCO’s announcement as reported by Lokmat Times and Free Press Journal, both dated September 2024.2 If you’re budgeting for a specific fare band, it’s worth a quick check at the station counter, since these tables do get revised.
Belapur-Pendhar Ticket Price
End to end, CBD Belapur to Pendhar (or the reverse) costs ₹30 per journey at current rates. Shorter hops along the line cost ₹10 or ₹20 depending on how many stations you’re covering. Use the table above as a guide, and confirm at the counter if you’re unsure which band your trip falls into.
Navi Mumbai Metro Monthly Pass
We could not find a currently published monthly or season-pass product for Navi Mumbai Metro Line 1 in CIDCO’s official ticketing information or the latest dated ticketing updates reviewed in August 2026. Commuters should check at the station counter for any newly introduced pass or frequent-travel product.
How to Buy a Ticket
QR-code ticketing is CIDCO’s confirmed, currently operational method for Navi Mumbai Metro Line 1, launched in mid-2025.3 Current ticketing options are as follows:
- QR ticket at the counter: confirmed available. This is the standard way to buy a single-journey ticket today.
- Ticket vending machines (self-service): not confirmed as installed at Line 1 stations; plan on a staffed counter rather than assuming a machine will be available.
- Rechargeable smart card: not confirmed as currently available. Reports on this have been inconsistent, and the most recent sourcing reviewed references QR tickets only.
- NCMC (National Common Mobility Card): CIDCO has described this as “coming soon” since at least mid-2025; no confirmation has been found that it has since launched on this line. NCMC is already active on the separate Mumbai Metro system (Lines 1, 2A, and 7); that’s a different operator, not CIDCO’s Navi Mumbai Metro.4
- Mobile app booking: not yet live for Navi Mumbai Metro. If you’ve seen references to booking metro tickets on the “Mumbai 1” app, that app belongs to the unrelated Mumbai Metro (MMOPL) system, not CIDCO’s Line 1.
- WhatsApp ticketing: not yet live for Navi Mumbai Metro. A WhatsApp ticketing number circulating online belongs to Mumbai Metro One/MMOPL, a different system entirely. Don’t use it expecting a Navi Mumbai Metro ticket.
For now, commuters should plan to purchase a QR-code ticket at the station counter unless CIDCO announces additional digital ticketing options.
First & Last Metro Timings
Under the timetable CIDCO introduced on 20 January 2025, still the standard schedule as of the most recent information reviewed, Line 1 runs:5
| First train | Last train | |
|---|---|---|
| From CBD Belapur | 6:00 AM | 10:00 PM |
| From Pendhar | 6:00 AM | 9:45 PM |
Note the last train from Pendhar leaves 15 minutes earlier than the last train from CBD Belapur, if you’re heading toward Pendhar late in the evening, don’t cut it close. On Sundays and public holidays, CIDCO runs a different schedule with the same first/last train times but a flat frequency all day (see below).6
Frequency
Trains run every 10 minutes during peak hours and every 15 minutes off-peak, on weekdays and Saturdays:5
- CBD Belapur peak windows: 7:30-10:00 AM and 5:30-8:00 PM
- Pendhar peak windows: 7:00-9:30 AM and 5:00-7:30 PM
On Sundays and public holidays, the schedule switches to a flat 15-minute interval all day, with no separate peak tier.6
Rail & Bus Connectivity
CBD Belapur metro station sits next to CBD Belapur suburban railway station, giving a practical connection into Mumbai’s suburban rail network at that end of the line. From other stations along the corridor, local bus routes and auto-rickshaw stands are the typical way to complete a last-mile trip. Bus schedules can change, so confirm current routes locally rather than relying on this page for real-time connections.
Passenger Facilities
Line 1’s elevated stations provide passenger facilities as part of CIDCO’s metro infrastructure. Facilities can vary by station, so commuters requiring specific accessibility or passenger services should confirm availability at their boarding station.
Future Extensions
CIDCO’s wider Navi Mumbai Metro plan includes two newly approved extensions beyond the currently operational CBD Belapur-Pendhar Line 1. In June 2026, the Maharashtra Cabinet approved a ₹5,575 crore package covering Metro Line 1A (CBD Belapur to Sagar Sangam, 3.02 km, 2 stations) and Metro Line 2 (Pendhar to Navi Mumbai International Airport Terminal 4, 14.07 km, 11 stations). Together with the existing Line 1, these would form a continuous roughly 28 km corridor from Sagar Sangam to NMIA once built. As of the most recent information reviewed, construction on Line 1A and Line 2 has not yet begun; CIDCO has targeted a construction start in FY 2027-28.7
Separately, Metro Line 8 (the “Gold Line”) is a distinct project connecting Chhatrapati Shivaji Maharaj International Airport (CSMIA) in Mumbai to NMIA, roughly 34.9 km with 20 stations. It was approved by the Maharashtra government in February 2026 and is being developed by CIDCO on a public-private-partnership basis. Line 8 is not the same project as Navi Mumbai Metro Line 1 or its Line 1A/Line 2 extensions, though the networks are expected to eventually interchange. Construction timelines reported for Line 8 have not been independently confirmed as underway.8
| Line | Route | Length | Status |
|---|---|---|---|
| Line 1 | CBD Belapur-Pendhar | 11.10 km, 11 stations | Operational since November 2023 |
| Line 1A | CBD Belapur-Sagar Sangam | 3.02 km, 2 stations | Approved June 2026; not yet under construction |
| Line 2 | Pendhar-NMIA Terminal 4 | 14.07 km, 11 stations | Approved June 2026; not yet under construction |
| Line 8 (Gold Line) | CSMIA-NMIA | ~34.9 km, 20 stations | Approved February 2026; separate project; construction status not independently confirmed |
Route alignments, construction schedules, and opening dates for all of the above should be treated as subject to change. See CIDCO’s official Metro project information for the latest status.
Airport Connectivity (NMIA)
Does Line 1 currently connect to Navi Mumbai International Airport (NMIA)? No. There is no operational metro service to NMIA as of August 2026. That said, airport connectivity has moved forward on paper: Metro Line 2 (approved June 2026) is planned to reach NMIA Terminal 4, and the separate Metro Line 8 (approved February 2026) is planned to connect NMIA to Chhatrapati Shivaji Maharaj International Airport. Neither is under construction yet. See our guide to reaching Navi Mumbai Airport for current options.
Tips for First-Time Commuters
- Budget an extra few minutes at the counter to buy a QR ticket. There’s no app or WhatsApp shortcut yet, so build that into your schedule rather than assuming a self-service option.
- If you’re travelling to or from Pendhar in the evening, keep in mind the last train from that end runs 15 minutes earlier than from CBD Belapur. Check the current schedule before heading out late.
- Off-peak trains (outside the windows listed above) tend to be far less crowded and more comfortable if your schedule is flexible.
- Travelling on a Sunday or public holiday? Expect trains every 15 minutes all day rather than the usual 10-minute peak service.
- Connecting from Mumbai’s suburban rail network, CBD Belapur is your easiest interchange point on this line.
Sources & Verification
A note on terminology: this guide distinguishes between “operational” (trains currently running), “approved” (a government body has cleared funding or construction but building has not begun), and “under construction” (physical work confirmed underway). Several Navi Mumbai Metro extensions discussed below are approved but not yet under construction. That distinction matters for planning your commute.
Primary Sources
- CIDCO – official Navi Mumbai Metro ticketing information and metro project/master plan documentation
Supporting Sources
Dated news reports used for timetable, fare, and ticketing updates where CIDCO does not expose the historical notification directly online:
- Free Press Journal, “Navi Mumbai Metro Line 1: CIDCO Cuts Belapur-Pendhar Travel Time By 90 Seconds From July 13” (10 July 2026)
- Lokmat Times, “Navi Mumbai Metro: CIDCO Announces Fare Cuts on Belapur-Pendhar Metro Corridor” (5 Sept 2024); Free Press Journal, “CIDCO To Cut Down Metro Fares By 33% On Belapur-Pendhar Route” (10 Sept 2024)
- Free Press Journal (17 June 2025); Mumbai Live (17 June 2025); Construction World, “CIDCO Launches QR Ticketing For Navi Mumbai Metro Line 1” (23 June 2025)
- Knocksense, “Mumbai Metro’s New National Common Mobility Card Now Active On 4 Key Lines” (11 June 2025, updated 31 March 2026)
- Oneindia, “Navi Mumbai Metro Line 1: New Timetable Brings 10-Minute Peak Hour Services” (Jan 2025); Moovit Updates (21 Jan 2025)
- Free Press Journal, “CIDCO Revises Navi Mumbai Metro Line 1 Timings On Sundays, Holidays For Maintenance” (9 May 2025)
- Free Press Journal, “Maharashtra Cabinet Approves ₹5,575 Crore Navi Mumbai Metro Expansion Linking Key Nodes With NMIA” (June 2026); Mumbai Live, “Maharashtra Approves CIDCO’s Navi Mumbai Metro Expansion Plan Worth INR 5,575 Crore” (June 2026)
- Metro Rail Today, “Maharashtra Approves ₹22,862 Crore Mumbai Metro Line 8 Connecting Mumbai and Navi Mumbai Airports” (February 2026)
Frequently Asked Questions
What is the current Navi Mumbai Metro fare?
Fares range from ₹10 to ₹30 depending on distance travelled, following a September 2024 fare cut. See the fare table above for the exact bands.
Is there a monthly pass for Navi Mumbai Metro?
No published monthly or season-pass product has been found for Line 1 as of August 2026, based on CIDCO’s official ticketing information and the latest dated updates reviewed. Check at the station counter for the latest ticketing options each time you travel.
How do I buy a Navi Mumbai Metro ticket?
A QR-code ticket purchased at the station counter is the only ticketing method confirmed as currently operational. Smart cards, the mobile app, WhatsApp ticketing, and NCMC remain pending as of the latest information reviewed.
Can I book a Navi Mumbai Metro ticket on WhatsApp?
Not yet on Navi Mumbai Metro. A WhatsApp ticketing number sometimes shared online belongs to the separate Mumbai Metro (MMOPL) system, not CIDCO’s Line 1.
What time does the first and last metro run?
First train: 6:00 AM from both CBD Belapur and Pendhar. Last train: 10:00 PM from CBD Belapur, 9:45 PM from Pendhar.
How many stations does Navi Mumbai Metro Line 1 have?
11 stations across 11.10 km, from CBD Belapur to Pendhar.
How often do trains run?
Every 10 minutes during peak hours, every 15 minutes off-peak, on weekdays and Saturdays. Sundays and holidays run a flat 15-minute interval all day.
Is there a metro connection to Navi Mumbai International Airport (NMIA)?
No, not yet. Metro Line 2 and the separate Metro Line 8 are both approved (June 2026 and February 2026 respectively) and planned to eventually reach NMIA, but neither is under construction as of the latest information reviewed. See our guide to reaching Navi Mumbai Airport for current options.
Which Navi Mumbai Metro station connects to the local train (suburban railway)?
CBD Belapur metro station sits next to CBD Belapur suburban railway station, making it the easiest interchange point between Line 1 and Mumbai’s suburban rail network.
What is Navi Mumbai Metro Line 1A?
Line 1A is a newly approved 3.02 km extension connecting CBD Belapur to Sagar Sangam, with 2 stations. It was approved by the Maharashtra Cabinet in June 2026 along with Line 2, but is not yet under construction.
Is Metro Line 8 the same as Navi Mumbai Metro Line 1?
No. Metro Line 8 (the Gold Line) is a separate, roughly 34.9 km project connecting Chhatrapati Shivaji Maharaj International Airport (CSMIA) to NMIA. It was approved in February 2026 and is distinct from Navi Mumbai Metro Line 1, though the two networks are expected to eventually interchange.
Pari Chaudhary
Founder & Editor
15+ years in digital, content and creative; a decade living in Navi Mumbai. Writes about the city's neighbourhoods, real estate, transport and daily life.
